Detailed engineering, delivery and installation of the piping for a new incineration line in the waste incineration plant at the Krefeld site on behalf of FISIA Babcock Environment GmbH.
- Integration of a new steam generator with an output of 90 t/h/41 bar 410°C waste throughput 25 t/h
- Detailed engineering
- Delivery and installation of a flue gas purification plant for the new boiler
Vocational training and quality management are essential for us. We are ISO 9001:2015 certified.
What can we do for you?
- Reduce total cost
- Streamline processes
- Conserve resources
- Create value
