Detailed engineering and installation of the piping for a new incineration line in the waste incineration plant at the Rüdersdorf site near Berlin on behalf of FISIA Babcock Environment GmbH.
Integration of a new steam generator with an average output of approx. 120 t/h and approx. 32MW power station electric power output, net (27.4%).
Vocational training and quality management are essential for us. We are ISO 9001:2015 certified.
What can we do for you?
- Reduce total cost
- Streamline processes
- Conserve resources
- Create value